NEW NEXON EV DTC MANUAL

Powertrain VCU Replacement Procedure 1 Introduction 1.1.1 Document Purpose This document shall describe the procedure for Powertrain VCU replacement. 1.1.2 Document Scope This specification addresses the requirement for replacement of Powertrain VCU during testing and end-of-line. TITLE: Powertrain VCU Replacement Procedure Document number: Date: 01/08/2023 Version: 1.0 Page:4 of 15 Prepared: Vaishali Rathore Checked: Diganta Baishya Approved: Arikapudi Suresh This specification is the exclusive property of Tata Motors Limited. Without their consent it may not be reproduced or given to third parties. The above specifications are subject to change and therefore suppliers are requested to refer the latest one. CONTROLLED COPY FOR RESTRICTED CIRCULATION © TATA MOTORS LTD.

RkJQdWJsaXNoZXIy MTIwNTUz