Start-Stop Switch Replacement Procedure Title: Start-Stop Switch Replacement Procedure Spec Num 2921 XX XXX A XXXX TBD Date: 22-Apr-20120 Version: 1.5 Page: 3 of 17 Prepared: Sabal V Checked: Awanish Tiwari Approved: Himanshu Saxena This specification is the exclusive property of Tata Motors Limited. Without their consent it may not be reproduced or given to third parties. The above specifications are subject to change and therefore suppliers are requested to refer the latest one. CONTROLLED COPY FOR RESTRICTED CIRCULATION © TATA MOTORS LTD. Change History Version Section Change details 0.1 All First release 0.2 2.1 and 2.2 Change in the Strategy - Diagnostics details has been removed. 1.0 2.2 Below changes has been made in PROCEDURE: 1.) 1st point is added with “Point Disconnect the vehicle battery” and subsequently all the points are incremented by 1 (i.e. earlier version of 1st point become 2nd point in this version, 2nd point become 3rd point and so on) 2.) 4th point has been changed to "Remove SSB from dashboard". Earlier it was "Remove SSB dashboard". 3.) 10th point has been changed to "Fix the dashboard". Earlier it was "Fix the SSB dashboard". 1.1 3 Start stop switch images added for Q5 1.2 3 Start stop switch images added for X451 and X445 1.3 3 Start stop switch images added for TigorMCE 1.4 3 Updated data for Tiago. 1.5 3 Updated image for Nexon EV
RkJQdWJsaXNoZXIy MTIwNTUz