NEW NEXON EV MY24 SERVICE MANUAL

HV ELECTRICAL SYSTEM_ELR 88 15. CRADLE MOUNTS ASSEMBLY SEQUENCE STEP 1  First place A & B mount on BIW & add 4mm THK washers on BIW side holes.  HEX FL BOLT M10X1.25X40 TS17130-10.9 SS-9400 – 4 Nos. Do torqueing as recommendation for A-Mount.  HEX FL SCR M10X1.25X30 TS17070 10.9 SS8451S2-YH – 2 Nos. Do torqueing as recommendation for B-Mount.  Before assembly ensure centralization of powertrain. Mounts should not be pre stressed in any direction.  TIGHTENING TORQUE = 60- 65 Nm  Torqueing sequence for Mount to BIW is 1-23. STEP 2  Add 5mm THK washers at B mount side.  HEX FL BOLT M14X1.5X55(DIN) EN 1665 - 10.9 -3 Nos. Do torqueing as recommendation for A-Mount.  HEX FL BOLT M12X65 TS17130 10.9 SS8451S2-YH 3 Nos. Do torqueing as recommendation for B-Mount.  Torqueing sequence for Mount to Cradle.  50% pre-torque to 4.  50% pre-torque to 5.  Repeat for 4 full torqueing TIGHTENING TORQUE = 125-130 Nm.  Repeat for 5 full torqueing TIGHTENING TORQUE = 105-110 Nm. STEP 3  C mount bracket is bolted with transmission assy.  H/FL BOLT M12X1.75X45 TS17130 10.9 SS8451S2-YH, - 5 Nos. Do torqueing as recommendation.  Torqueing sequence for C Mount Bracket is 12-3-4-5, Pre torque = 18 Nm up to 5.  Torqueing sequence for C Mount Bracket is 12-3-4-5, repeat torque = 105 - 110 Nm up to 5.

RkJQdWJsaXNoZXIy MTIwNTUz