NEW NEXON EV MY24 SERVICE MANUAL

HV ELECTRICAL SYSTEM_ELR 89 STEP 4  C mount big bush bolted with subframe assy.  H/FL BOLT M12X1.25X105 STEEL CONFORMING TO PROPERTY CLASS 10.9 OF IS: 1367 PT3, 1 Nos. Apply specified torque.  H/FL BOLT M14X1.5X95 TS1713010.9SS8451S2-YH & H/FL NUT AM14X1.5 TS17430 -10SS8451S2-YH 1 Nos. Apply specified torque.  Torqueing sequence for C Mount to Bracket & Sub-frame is 10-11 & TIGHTENING TORQUE = 105 -110 Nm for 10 & TIGHTENING TORQUE = 190-195 Nm for 11. 16. FRONT FRUNK ASSEMBLY WITH BRACKET REMOVAL & ASSEMBLY REMOVAL 1. Refer Instructions for working on HV Components mention before starting work. 2. Remove Auxiliary (12V) battery (Refer Auxiliary battery removal procedure in LV Electrical section). 3. Remove the mounting screw and take out Front Frunk Assembly. 4. Remove Front Frunk Assembly Bracket. ASSEMBLY Follow the reverse procedure of Removal.

RkJQdWJsaXNoZXIy MTIwNTUz