Start-Stop Switch Replacement Procedure
Title:
Start-Stop Switch Replacement Procedure
Spec Num 2921 XX XXX A XXXX
TBD
Date:
22-Sep-2015
Version:
1.0
Page: 3 of 9
Prepared:
Saichaitanya
Checked:
Nagnath Dhale
Approved:
Dinesh DG
This specification is the exclusive property of Tata Motors Limited. Without their consent it may not be reproduced or given to third
parties
.
The above specifications are subject to change and therefore suppliers are requested to refer the latest one.
CONTROLLED COPY FOR RESTRICTED CIRCULATION
© TATA MOTORS LTD.
Change History
Version Section
Change details
0.1
All
First release
0.2
2.1 and 2.2
Change in the Strategy - Diagnostics details has
been removed.
1.0
2.2
Below changes has been made in
PROCEDURE:
1.) 1st point is added with “Point Disconnect
the vehicle battery” and subsequently all
the points are incremented by 1 (i.e.
earlier version of 1st point become 2nd
point in this version, 2nd point become
3rd point and so on)
2.) 4
th
point has been changed to "Remove
SSB from dashboard". Earlier it was
"Remove SSB dashboard".
3.) 10
th
point has been changed to "Fix the
dashboard". Earlier it was "Fix the SSB
dashboard".